Urban renewal

A safe new building in place of one that may not withstand an earthquake. We plan the whole process with the owners and share every step openly.

Assess my building

Renewal, in section

Once the existing building is officially found to be at risk, it is demolished and replaced by a new one designed to current codes, starting with a soil survey.

Existing buildingNew building1Soil survey2New foundation3Reinforced concrete frame4Building inspection5Occupancy permit
Illustrative drawing.

Why renew?

Step by step

Urban renewal in Türkiye follows Law No. 6306 on the Transformation of Areas under Disaster Risk. Every building is different; these steps show the general flow.

  1. First meeting and site visit

    We review the building, title deeds and zoning status with you and listen to what the owners expect.

  2. Risk assessment

    The assessment is carried out by an organisation licensed by the Ministry of Environment, Urbanisation and Climate Change. Once final, it is annotated on the title deed. Owners may object within 15 days of notification.

  3. Owners’ decision

    For a building found to be at risk, the decision is taken by owners holding at least two thirds of the shares. We help prepare and inform the meeting.

  4. Design and contract

    Architectural and structural designs are prepared, and the flat allocation and each owner’s share are written into the contract.

  5. Permits and moving out

    Demolition and building permits are obtained from the municipality and the building is vacated. Owners may apply for the rent support available under the law.

  6. Demolition and construction

    Demolition is carried out safely. Construction proceeds with a soil survey and independent inspection, and we keep the owners informed throughout.

  7. Permit and handover

    The occupancy permit is obtained, the flats are handed over and new title deeds are issued to the owners.

For owners

Conditions and amounts change over time. Please confirm the current terms with the relevant authority before applying.

Frequently asked

How do I find out whether my building is at risk?

You apply to an organisation licensed by the Ministry. It takes core samples, inspects the reinforcement and issues a report. An owner or their legal representative can apply.

Do all neighbours have to agree?

No. Once the risk report is final, the decision is taken by owners holding at least two thirds of the shares. A procedure set out in the law applies to the shares of owners who do not agree.

Where will I live during construction?

Owners move to temporary housing once the building is vacated. Owners and tenants who meet the conditions can apply for rent support.

How is the size of my new flat decided?

By the zoning status of the plot, the permitted floor area and the approved design. The flat allocation and shares are agreed in writing before construction starts.

Our residential references

All projects

Let’s take the first step for your building.

Send us your address and building details on WhatsApp and we will get back to you with a first assessment.